Check out Gizmag's new site The Mobiler - a guide to all things mobile
The Toyota/RIKEN wheelchair - this laboratory prototype runs with the EEG detector run by ... Toyota makes a wheelchair steered by brain waves
Capable of speeds of over 32 knots but able to cruise effortlessly at 20 Like a cat outta hell: The ultra-luxury Aeroyacht 110
Dragon NaturallySpeaking 10 Preferred Wireless: an honour to goodness wife shaver if you h... Dragon NaturallySpeaking 10 speech-to-text engine reviews itself
The Scamander RRV goes for a dip to show off its amphibious qualities. ‘Go anywhere’ amphibious vehicle might go under
Entrepreneur behind the Segway developing eco hybrid that will run on anything that burns Dean Kamen developing eco hybrid that will run on anything that burns
MORE TOP STORIES »
AERO GIZMO

Final assembly begins on P-8A Poseidon anti-sub plane

By Kyle Sherer

16:02 April 10, 2008 PDT

The first P-8A fuselage is lowered into a tooling fixture in Renton, Wash.
 Photo: Boeing ...

The first P-8A fuselage is lowered into a tooling fixture in Renton, Wash. Photo: Boeing image - Jim Anderson

Image Gallery (2 images)

Boeing has begun final assembly of the first P-8A Poseidon, the long-range anti-submarine plane that will replace the P-3 Orion. The US Navy plans to purchase 108 P-8As, and initial operational capability is scheduled to begin in 2013. The P-8A will have anti-surface warfare, intelligence, surveillance and reconnaissance capabilities.

Spirit AeroSystems delivered the P-8A fuselage to Boeing, where it was fitted with wires, tubing, and other small parts, on Boeing’s new, more efficient assembly production line. The wings will be joined to the body later this year.

"The Navy expects us to meet each and every commitment, and achieving this milestone demonstrates that the P-8A team is up to the task, "said Bob Feldmann, Boeing vice president and P-8A program manager. "Our Boeing Commercial Airplanes and Spirit AeroSystems teammates deserve credit for their outstanding performance and teamwork in building the wings and fuselage for the first test aircraft."

The P-8A is being built by a Boeing-led team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. Delivery of the first test aircraft to the Navy, and first flight, is scheduled for 2009.

Tags
Post a Comment

Login with your gizmag account:




Or Login with Facebook:


Connect

Related Articles Email this article to a friend

Just enter your friends and your email address into the form below ...




Privacy is safe with us because we have a strict privacy policy.

Recent popular articles in Aero Gizmo
The Mobiler
Recent Comments Featured Galleries